ProductsTechnologyPartnersResearchCompany
Journal
CareersAugust 28, 2026Lumerian Labs1 min read

We're hiring our founding team

We are hiring a small number of people to build physical AI for energy infrastructure, from radiometric thermal imagery to title documents, for the engineers and analysts who sign off on the results.

Contents01The work02How we work03How to reach us
Published
August 28, 2026
Series
Careers

Lumerian Labs was founded in 2026 to build physical AI for energy infrastructure, starting with utility-scale solar. Lumerian Core keeps one record of the flights, title documents, schedules and work orders behind an asset, and turns each observation into a recommended next action. We are hiring the founding team to build it out.

01The work

  • –Spatial and temporal machine learning. Tying observations from different flights and sensors to the same component, and modelling how each component behaves between observations.
  • –Document and evidence AI. Reading long, scanned, legal and technical documents, and making every answer point to the region it came from.
  • –Systems that run where the data lives. One build that runs hosted or on premises, within the limits of operational networks.
  • –Energy-domain engineering. People who have worked on solar, wind or storage sites, in development, construction or operations, and know what a decision there requires.

02How we work

  • –Evidence before claims, in what we build and in what we publish.
  • –Simple baselines first. A result counts only if it holds on sites and dates a model has not seen.
  • –A small team with full ownership of its work, close to the crews, analysts and project teams who use it.

03How to reach us

If this is work you want to do, write to hello@lumerianlabs.com with what you have built and why this problem interests you.

More from the journal
  • November 3, 2026Lumerian JournalIntroducing Lumerian Labs
  • October 21, 2026Lumerian JournalWhy field data is weeks old by the time anyone acts on it
  • October 14, 2026Engineering notesInside the Lumerian Core: platform, Luminol and runtime
Founded
2026
Founded
Solar parks
06
Solar parks
Thermal frames
82,368
Thermal frames
  • Aperture
  • Prism
  • Helm
hello@lumerianlabs.com2026